Government
Over the years, we’ve seen Federal, State and local governments shift their preference toward the design-build delivery method. Limbach and LEDS have participated in various projects utilizing an integrated MEP design-build delivery.
Russell Knox Building (MILDEP)
Location: Quantico Marine Base, VA Delivery Method: Design Build Built to house all military intelligence agencies, this 750,000 square foot facility includes office space, a training center, a large Tier 4 data center, dining facility and other support areas. LEDS participated with Limbach as the engineer of record and ensured the project achieved a LEED Certification.
|
|
Upper Arlington Public Library
Location: Upper Arlington, VA Delivery Method: Design Build LEDS worked with the Limbach branch to contribute professional engineering and energy engineering services to this project. Ultimately, the library received a performance contract and building system upgrade.
|
|
Sydney Yates Building
Location: Washington D.C. Delivery Method: Design Assist LEDS and Limbach were involved with the design team in a design-assist capacity. By urging for the utilization of prefabrication and offsite construction, Limbach was able to relocate a large amount of the work to the fabrication shop, reducing cost, shortening the schedule and enhancing safety.
|